A useful activewear quotation prices a defined product and order, with visible assumptions. Without that basis, two unit prices may describe different materials, quantities or delivery scopes. Prepare a concise RFQ so the supplier can identify missing decisions before quoting.
Send the product reference, intended use, material direction, quantity by colour and size, branding, packing, destination and target timing. Mark unknowns clearly and ask for inclusions, exclusions and the basis of the estimate.
What Product Is Being Quoted?
- Style name or MIQI product reference.
- Intended activity, customer, fit and size range.
- Current tech pack, reference garment or annotated images.
- Construction details that must be retained.
- Whether the request is for development, sampling or bulk production.
A reference image starts a discussion; it does not specify hidden construction or material. Use the tech-pack guide to identify the missing information.
What Is the Quantity Basis?
State units per style and colour, then the size allocation. For a set, state both the number of sets and the individual garments. Do not provide only one total for a multi-style collection.
MIQI projects normally begin at 100 pieces per colour across three sizes, subject to style, material and customization review. Ask for the final basis and any separate fabric or component minimums. See how MOQ is calculated.

What Material and Customization Are Included?
- Fabric reference or required hand feel, structure and weight direction.
- Available colour or custom colour development.
- Logo file, method, dimensions and placement.
- Labels, hangtags, packaging and special components.
- Required test evidence or retailer specifications.
If the material is undecided, ask for clearly labelled options. A provisional quote should say which fabric and components it assumes.

Which Costs Are Included or Separate?
Request a breakdown that lets you compare like with like. Not every project needs every item, but exclusions should be visible.
- Development, pattern or sample charges and revision scope.
- Material, garment and branding price basis.
- Setup or artwork trial charges.
- Labels, individual packing and cartons.
- Testing, inspection, courier and other services if requested.
Confirm currency, quote validity and what triggers a revision. A lower unit price can exclude work that another supplier has included.
What Does Delivery Mean in This Quote?
State the destination and required delivery point. Ask for the agreed delivery term and named place, plus what transport, insurance, import clearance, duties or local charges are included or excluded.
Do not compare a factory collection price with a delivered estimate as though they cover the same scope. Confirm the allocation of responsibilities in the actual quotation and shipping arrangement.

What Must Be Approved Before the Order?
- Final specification, material and sample.
- MOQ and size or colour quantities.
- Price, payment stages and change conditions.
- Production schedule and dependencies.
- Inspection, packing and shipment-release requirements.
For a target launch date, distinguish estimated sampling, production and transit periods. Use the sample plan to expose approval dependencies.

Use This Short RFQ Structure
Product: reference and intended use. Fit: size range and available measurements. Material: confirmed reference or selection brief. Order: units per style, colour and size. Branding: artwork and placement. Packing: required items. Delivery: destination and target date. Open decisions: items for the supplier to review.
Attach one current file set and name a contact who can consolidate answers. This is more useful than sending separate, conflicting messages.
Buyer Questions
Why is there no fixed price on the product page?
The final price depends on material, construction, quantity, branding and delivery scope. MIQI product pages show development directions, with project-specific quotations.
Can I request a quote without a finished design?
Yes. State what is available and ask for a scope review. Any estimate should identify assumptions and what must be confirmed before a final quotation.
Should I send a target budget?
It can help assess options if you explain whether it refers to garment cost, delivered cost or a wider launch budget. The supplier still needs the product and quantity scope.
RELATED PRODUCT DIRECTIONS
Explore Styles for Your Brief.
Use these styles as starting points. Fabric, fit and branding are developed for your project.
Your Next Step
Shortlist a product direction, organize the RFQ checklist and submit your project brief. Mark flexible requirements so alternatives can be reviewed without changing your essential product goals.
